727-734-8707    

Carver 37 Coupe 37 Change Order

Specifications

Asking Price $ 439,000
Boat Name Change Order
Builder Carver
Length: 37'
Beam: 13'
Draft FT / Inch : 3 ' / 2 "
Condition: Used
Cruise Speed: 22 knots
Engines: Volvo D-4 EVC 300.00 HP
Location : Fort Myers, Florida

The Broker

Picture of: Wally Catalano
Wally Catalano
1-727-647-9364
wally@tgyg.com
343 Causeway Blvd., Dunedin, USA

This Well Maintained one owner 37 Coupe comes with a transferrable extended engine warranty in place till 11-21-22.  Boat is well equipped with Plotter, Radar, Auto Pilot, bow and stern Thrusters.  Engines last serviced March 2019 as boat is kept in Fresh water on Canal to Lake Okeechobee River.  Owner also states upon sale of vessel he will do another engine service with oil changes.

Current owners love this vessel but want to move up to a liveaborad. Boat is currently kept in High and Dry Hurricane Barn at Sweet Water Marine in Fort Myers.

  •   Television upgrade to Samsung Brand
  • Polished Stainless Steel Anchor
  • Color Changing LED Lights, Cockpit Ceiling
  • Flagpole and Mount, Transom, Flag and Clips
  • Foredeck Sunpad Cover, Lined Tweed
  • Exterior Seat Cover, Lined Tweed
  • Cockpit Table Cover, Lined Tweed
  • Step in Engine Room to improve Cockpit access
  • Additional 4 LED lights in Engine Room
  • Recess Galley Stove, Solid Surface Cover
  • Garmin Transducer GT51 Thru Hull
  • Marine Air Brand A/C in Lieu of Webasto
  • Garmin Sinstrument Display GMI 20 Color LCD
  • Fusion UD 750 Stereo in Salon w/fusion remote installed in cockpit
  • JL speakers, Fusion AMP, Fusion Remote in Forward Master Stateroom
  • A/C Vent in Dash at Helm

 


Contact us
for more information or a quote on the #YearBuilt# #Builder# #model# #BoatName#

Leave this field empty